Installation, 2019. The Waste Treatment and Disposal Plant is now part of the life in Peccioli and Belvedere Spa, the publicly owned company that runs the plant, became a reference point for the design, innovation and development of the whole territory.

So, this is the meaning of the installation which aims at bringing the element at the basis of the entire Peccioli system into the historic center of the town, among the people.

The video, live from Legoli, offers an overview from different viewpoint: on the plant, the surrounding area, the work Presences by Naturaliter and the intervention by David Tremlet on the retaining wall the landfill.

Share with love!